
Secondary Containment
Futura Industries
Ground-up construction of new secondary containment areas for a metal extrusion facility — from demolition through rapid-curing concrete, chemical-resistant linings, and FRP equipment stands.
Scope of work
What we performed
- Demolition of existing equipment and concrete containment areas
- Full construction of new secondary containment areas
- Installation of rapid-curing structural concrete
- Installation of secondary containment coating systems
- Mat-reinforced Novolac vinyl ester linings
- FRP grating and structural steel equipment stands
Gallery
Futura Industries

Let's get to work
Have a concrete problem worth solving?
From emergency structural repair to full containment retrofits, our crews self-perform the work and stand behind it. Tell us what you're dealing with and we'll schedule a free on-site condition survey.
